
Your car park
reduces your electricity costs
Turnkey car park PV directly on site. High self-consumption, peak shaving, protected vehicles and a measurable CO2 balance. As a general contractor from a single source, from steel construction to photovoltaics to the transformer station.
Six reasons for solar on your car park.
The unused car park becomes the cheapest energy source right on site.
Reduce electricity costs
High self-consumption directly at the plant. You replace expensive grid electricity with your own solar power at predictable generation costs, with an exceptionally low price per kWp and a payback period typically under ten years.
Peak shaving
With battery storage and peak shaving you smooth out power peaks and noticeably reduce your grid charges.
Protect vehicles
No ice scraping in winter, cool cars in summer, protection from hail and snow. A visible benefit for your employees.
CO2 and ESG
Measurable CO2 savings for your sustainability reporting, your supply chain and your rating.
Charge your EV fleet
Charge your vehicles directly under the carport. Ready for wallboxes and DC fast chargers, powered by your own electricity.
One point of contact
Steel construction, photovoltaics, transformer station and grid connection from a single source. You have one conversation, not five trades.
From our warehouse to your car park.
Own stock, binding fixed price, short construction time.
Own stock
We keep modules, inverters and battery storage in stock, so supply shortages do not hold us up.
Binding fixed price
We quote even large projects at a fixed price. Planning and budget certainty from the start.
6 to 12 weeks
From order to a completed, connected system typically six to twelve weeks.
What your system looks like.
A short walkthrough of a completed car park PV system, with the key benefits at a glance.
From obligation to revenue source.
New and fundamentally renovated car parks with 35 or more parking spaces require a solar canopy in North Rhine-Westphalia. We take care of it turnkey, with a focus on larger car parks from 100, ideally from 250 parking spaces.
Calculate car park potential →
One partner. The whole journey.
One point of contact. We coordinate trades, authorities and the grid operator.
Feasibility
Site check, yield and cost-effectiveness study. Go or no go.
Planning & permitting
Design, grid connection application, structural engineering, building permit, expert reports.
Financing & procurement
Business case, operating model, supplier-neutral procurement.
Construction as general contractor
Steel construction, photovoltaics, transformer station. All trades.
Commissioning & operations
Grid connection, commissioning, monitoring, maintenance.
Buy it, or invest nothing at all.
You decide whether the system belongs to you or whether you simply draw on affordable solar power.
Buy and operate yourself
You invest, the system belongs to you, and the full yield and independence from electricity price increases stay in-house.
- Highest return over the lifetime
- Independence from rising electricity prices
- Depreciation and possible subsidies available
- Planned, built and handed over turnkey
No investment (lease or PPA)
We finance and operate, you draw on affordable solar power or lease out your site.
- No capital outlay, no technical risk
- Predictable electricity price below your grid tariff
- Off-balance-sheet, preserves your credit lines
- Fully managed including operation
What does your car park deliver?
Enter your parking spaces and immediately see output, annual yield and cost-effectiveness. The same calculation logic as in our project development.
Calculate now →Car park PV in Halle: approximately 2.4 MWp delivered.
For a confectionery manufacturer in Halle (Westfalen) we delivered a turnkey car park PV system, from the steel structure to the photovoltaics to the integration into the on-site grid. Approximately 2.4 MWp on the car park, all trades from a single source.
Discuss your project →
Free initial assessment for your site.
Send us the key details of your car park. We will get back to you with an initial assessment of output, yield and cost-effectiveness. No obligation and no cost.
- Response from a dedicated contact person
- Initial assessment at no cost and no obligation
- Product- and supplier-neutral advice
